Projects
Vertical Gas Filters
Client: SPX Flow Technology
Project: Clair Ridge Shetland Oil field development
End Client: BP Oil & Gas
Materials: Titanium Gr2Three Titanium Gr2 Sea Water Blast proof storage tanks 4m long x 2.5m wide x 3m high. All units were fabricated and delivered to Clair Ridge Project on time.
65110 SR Guard Filter
Client: Amazon Filters LTD
Project: FPSO Gimboa SRP Package
End Client: VWS Westgarth LTD / Sonangol
Materials: Super Duplex S327603 off super duplex vessels 1m diameter x 2.5m x 12mm thick. All internal filter bags fitted and assembled in-house. Filters boxed and shipped on time.
DN200 FLOWMETER
Client: Siemens Flow Technologies
Project: N/A
End Client: N/A
Materials: 304 L to C/S rubber lined with hyperlonSpecial for Siemens 2m converted to suit 2.2m diameter pipeline. Full assembly including internal coils and electric wiring.
Sulphate Removal Unit
Client: Plenty Process Filtration
Project: Marlim Leste Field Development P53
End Client: VWS Westgarth / Petrobras AS
Materials: Super Duplex S32750 to S3227603 x super duplex filters 1.5m diameter x 3m long x 25mm thick. ECF recoded all welders to comply with material changes and ASME code. Production did not stop and vessels were painted, packed, and delivered on time.
Heat Exchanger
Client: Zeta Ltd.
Project: N/A
End Client: N/A
Materials: LT50 Carbonsteel1.5m diameter x 2m long x 15mm thick. 1000 tubes expanded and welded. Inspecion by RSA to PED 5500.
Sparge Pipes
Client: Siemens Water Technologies
Project: N/A
End Client: N/A
Materials: Titanium Grade 2Titanium marine sparge pipes.
Titanium Impellor
Client: Crystal Global Millennium inorganic Chemicals
Project: N/A
End Client: N/A
Materials: Titanium Gr21.2mt dia impellor
Prelude Skids
Client: Siemens Water Technologies
Project: Prelude Floating Liquefied Natural Gas (FLNG) Development
End Client: Shell Oil & Gas
Materials: Titanium Gr2De- chlorination Skid units Piping sizes from 1”nb to 12”nb was installed on the Prelude FLNG facility. All six Skids delivered on schedule to Prelude Project.
Clair Ridge Tanks
Client: SPX Flow Technology
Project: Clair Ridge Shetland Oil field development
End Client: BP Oil & Gas
Materials: Titanium Gr2Three Titanium Gr2 Sea Water Blast proof storage tanks 4m long x 2.5m wide x 3m high. All units fabricated and delivered to Clair Ridge Project on time.